(16 October 2015)—KSB Pumps Ltd. India won an order for the supply of six boiler feed pumps to be installed in the new fossil-fueled power station located in Tanda in the Indian state of Uttar Pradesh. India’s national power utility is currently building two new power plant units there, each with a capacity of 600 megawatts (MW). The pumps are designed for a pressure of 500 bar. An electric motor and a turbine with power ratings of 11 MW and 17 MW respectively will serve to drive the pumps. Besides the high-pressure boiler feed pumps, the scope of supply includes six booster pumps, baseplates, electric motors, hydraulic couplings, oil coolers, gearboxes as well as noise enclosures and related instrumentation. Delivery will begin in November 2016 and is expected to be completed by May 2017.