ERLANGEN, Germany (April 7, 2014) – The Andong combined cycle power plant (CCPP) in South Korea was erected in a record time of only 24 months. This liquefied natural gas (LNG) fired plant has an electrical capacity of 417 megawatts, making it the second Siemens operating H-class-based combined-cycle power plant in Asia with an efficiency level of more than 60 percent. The owner and operator is Korea Southern Power Co. Ltd. (KOSPO), a power supply utility.
Digital Partners
Trending
Why energy efficiency should matter to you.
Gain a thorough understanding of piping applications for pumped systems, with special focus on suction and discharge piping requirements.
Discover essential strategies to attaining 5-year mean time between failure on industrial hot oil pumps.
Learn about examples of AODD pumps in explosive applications, how to select an explosion-proof AODD pump and much more in this webinar.
From Our Partners
Gain a thorough understanding of piping applications for pumped systems, with special focus on suction and discharge piping requirements.
Sponsored by
Discover essential strategies to attaining 5-year mean time between failure on industrial hot oil pumps.
Sponsored by
Learn about examples of AODD pumps in explosive applications, how to select an explosion-proof AODD pump and much more in this webinar.
Sponsored by
The pumps play a pivotal role in wastewater treatment for Springfield, Illinois.
Sponsored by
These pumps offer an alternative to centrifugal and gear pumps, as well as mag-drive pumps.