ERLANGEN, Germany (April 7, 2014) – The Andong combined cycle power plant (CCPP) in South Korea was erected in a record time of only 24 months. This liquefied natural gas (LNG) fired plant has an electrical capacity of 417 megawatts, making it the second Siemens operating H-class-based combined-cycle power plant in Asia with an efficiency level of more than 60 percent. The owner and operator is Korea Southern Power Co. Ltd. (KOSPO), a power supply utility.