Lew Beck, Duke Energy, Oconee Nuclear Station
Lew Beck is a member of the Engineering Rapid Response Team in the Reactor & Electrical Systems Group (RES) with Duke Energy at the Oconee Nuclear Station, Oconee County, SC, 864-885-3329.
Digital Partners
Trending
Solving water loss with distribution network digitalization.
Leveraging smart water tools to address water loss and boost operational efficiency.
Combining the right pump technologies with advanced instrumentation can lead to long-term competitiveness.
From Our Partners
Where and when to use the right pressure technology.
Sponsored by
Join us for a session exploring the latest motor control technology, and learn how your organization can achieve significant operational and financial benefits.
Sponsored by
Cut downtime and costs with proven tips for handling, installation and material selection.
Sponsored by
How to reduce total cost of ownership, waste and downtime with AODD pump technology.
Sponsored by
Enhance your process efficiency with Hydro-Thermal’s patented direct steam injection heating systems.