The Northeast Transmission Line project’s impact on Houston’s water supply and subsidence mitigation.
Jaipal Musku
Jaipal Musku, PE, is senior project manager at LAN. He has more than16 years of experience in program management, planning, design and engineering construction phase services for large-diameter waterline projects. He worked as the NETL program design and construction project manager. Visit www.lan-inc.com.
Digital Partners
Trending
In the aftermarket, coupling selection and installation discipline are critical.
A guide to alignment challenges, considerations and strategies.
How an oil production company gained versatility and reduced maintenance needs.
From Our Partners
In this webinar, we’ll explore how engineering teams use PIPE-FLO to design, model and validate water-based systems that optimize energy usage, scale with operational growth, and maintain long-term durability.
Sponsored by
Learn how electrical signature analysis (ESA), machine learning and pump digital-twin models work together to identify pump-specific faults and performance issues and much more.
Sponsored by
No single flow meter technology can accurately measure all types of media or meet all application needs.
Sponsored by
A data-driven guide to achieving operational certainty and ending daily tech failures.
Sponsored by
Attendees will see a live showcase of technology defining the modern plant floor, from AI-powered translation to GPS and team-wide safety alerts and much more in this webinar..