Whether the pump is using a motor or engine is just one important consideration.
dewatering
Proper mine dewatering is critical regardless of the type of mining in operation.
In-situ soil mixing options provide a cost-effective approach that can mitigate many perceived impacts.
A temporary installation could remove 1.3 billion gallons of polder water in two weeks.
Make your dewatering pump the most effective one
The Pump Industry Was Ready When Disaster Struck
Torrential rain left 2 million gallons of water on the field, delaying a game
Companies should gather data and implement systems to keep job sites dry so contractors can complete their work on time and within budget.
CHICAGO, IL – Leading global water technology company Xylem, will address the challenge of ‘urban resilience’ by showcasing its portfolio of water technologies at the WEFTEC 2017 in Chicago from October 2-4. Xylem’s extensive range of proven, smart water technologies help communities tackle critical water challenges across the water cycle and support sustainable water management.
SCHAFFHAUSEN, Switzerland (May 5, 2017) – Xylem announced two international appointments at its dewatering business, which are effective immediately.
Positive displacement pumps can provide cost savings over similar dewatering solutions.
Spatial constraints and communication were critical factors in the temporary lift station’s design and implementation.
Construction projects on the scale of Stuttgart 21 in Europe require careful planning combined with expertise in a number of engineering fields.
A specification formula that accounts for variations in load profile helps designers select pumps based on real-world system demands.
Pump bypass solution provides access for critical repair work.
Emergency dewatering equipment was deployed to handle the aftermath of the estimated 6.9 trillion gallons of rainwater dumped on Louisiana in August.
Denver’s Coors Field replaced old chopper pumps in its underground vault to better manage runoff, potential flooding and the 200,000 gallons used for cleaning.
The project was finished ahead of schedule and $4 million under budget.
One manufacturer fulfills dewatering and wastewater needs in the underground transportation system.
Optimization of the selected submersible propeller pumps saved the facility up to $200,000 per year.
End users must consider several factors to ensure the correct pump for their specific needs.