Pumping Prescriptions
by Lev Nelik, Ph.D., P.E., Pumping Machinery, LLC, P&S Editorial Advisory Board

Third in a Series

Editor’s Note: Barry T. Brown of Spurlock Station, Unit 2, East Kentucky Power Cooperative contributed to this column.

In the first two articles of this series (Pumps & Systems, December 2016, read it here, and January 2017, read it here), we discussed the issue of leaky seals on double-suction horizontal split-case pumps mounted in a (somewhat unusual) vertical orientation. Both sides (inboard and outboard) leaked on all three pumps for years in the specific power-generation unit at the East Kentucky Power site.

The earlier articles described the application of the PREMS-2A data acquisition system to initiate the troubleshooting process and evaluate the impact of operation (proximity to the best efficiency point [BEP]), vibrations (possible hammering effect on seals) and similar factors.

It was determined the pumps operated within satisfactory proximity to the BEP, and a continual monitoring of vibrations (including spectral analysis) revealed no issues.

The effect of the alignment and nozzle loads, as well as seal assembly detail, was to be evaluated next during the removal of a pump at the next outage. This article describes some findings of the pump removal and disassembly inspection.

Dial indicatorsDial indicatorsImages 1 and 2. Dial indicators moved no more than 0.005 inches, which is satisfactory, and confirmed that flexible joints do the job of preventing piping load to be exerted and distorting the pump casing. (Images courtesy of the author)

Dial indicators were installed at the pump flanges during piping unbolting, and no significant movement was noticed. The pump inspection revealed:

  • No radial runout issues on the shaft (before removing the rotor from the casing). Checked at the coupling end, between drive end (DE) bearing and seal and between non-drive end (NDE) bearing and seal.
  • Axial end play of the shaft was essentially zero.
  • No significant impeller runout.
  • Minor wear of wear rings, with diametral clearance about 0.010 inches.
  • Both sides of the impeller had some cavitation damage (after about seven years in service), although the NDE side had significantly more damage than the DE, indicating possible non-uniform suction piping flow.

Several observations were made after an examination of the seals (John Crane Type 1 single spring).

The primary seal face did not move forward and appeared to be stuck to the shaft on its elastomer. Seal rotary could not be easily removed from the shaft and was tapped off with a hammer and chisel using lubricant on the bellows elastomer.

The NDE side seal rotary was damaged apparently during the initial installation—the bellows were rolled under, causing the seal face to be significantly out-of-parallelism with the stationary face. The DE side seal did not have this same type of issue.

The interference between the seal bellows and the shaft was 0.020 inches, so the seal rotary could not be installed (even with lubricant) by hand, which is contrary to the instruction manual and expectations.

This interference appeared to be significant and raised questions: Was the seal manufactured incorrectly? Was the shaft made oversized, incorrectly? Did the seal elastomer bellows swell during service?

Drive-end impellerImage 3. The pump’s drive-end impeller suction eye
Non-drive-end springImage 4. The non-drive end spring retainer

Another observation was the seal construction was soft (rotary) versus hard (stationary). Also, there was no venting arrangement, which meant air accumulation at the top seal could have been a contributing issue.

Drive-end sealDrive-end sealImage 5 & 6. Drive-end seals

The action items included:

  • Verify proper fit between the elastomer and the shaft and determine the cause of excessive interference.
  • Provide proper venting to eliminate air pocket at the seal area during startup.
  • Use hard-to-hard seal configuration to resist any particulate that might enter with cooling water.
  • Rebuild the pump with these modifications and monitor its performance.

We will report on these findings in the final article (fourth in this series) as soon as we have the results. We would like to thank all those who provided their input.