WEFTEC coverage sponsored by:

LUANDA, Angola (17 June 2015) – In December 2015 the regrowth works of the Cambambe hydroelectric power station, in the Kwanza River, about 180 kilometers southeast of Luanda, the capital of Angola, will be concluded. This dam currently supplies power to the cities of Luanda, Ndalatando, Cacuaco, Malanje, Gabela, Porto Amboim and Sumbe, benefiting a population of approximately 8 million people.